While
the entering structure is to be built on on the right side of the river
bank it would be able to release 113 cubic meters of water 165 meters
below of this structure a 5.3 meter and 84 meter deep diametrical gate
structure has been built.
Under
the system of water Management this consisted with a structure which is
6560 meters long, a 6.2 meter size cylindrical horse shoe shaped low
pressure tunnel a 15 meter size cylindrical as well as 160 meter deep
pillar and also a high pressure tunnel. The end of the high pressure
tunnels down side -which is being built next to the power house - consists
of steel pipes. The face of the so called pipes are 4.5 meter in size. The
high pressure tunnel system is divided in two 2.5 meter cylindrical parts
in step by step to concentrate the water in to each generator. The power
station where there are three electric power turbines is 70-18-34.7 meter
in size.
|